Need Help?
01706672092




Couldn't load pickup availability
All surfaces should be clean, dry and free from dirt, debris and other contaminates.|Minimum of 2/3 coats required.|Ensure timber is fully dry (allow 3 days) before laying plastic floor tiles, foam and rubber-backed carpets, loft insulation etc.|Treatment will typically dry in 1-3 days.
Thanks for subscribing!
This email has been registered!
| Product | SKU | Description | Collection | Availability | Product type | Other details |
|---|